Eligibility Criteria

  1. Single Public building can receive technical support for up to 500 kW of PV systems and financial support up to 100 kW.
  2. Clients shall have a reasonable amount of non‐shaded, unobstructed roof space for the PV system installation.
  3. Clients shall apply a net metering scheme before installing the PV system.
  4. Facilities installing LED lighting and applying Energy Efficiency plans are highly recommended.
  5. Clients shall apply a net metering scheme before installing the PV system.
  6. Abiding by the service provider list approved by the project.
  7. The facility will be committed to deliver all data of electrical consumption to the project management for the statistical and monitoring purpose.
  8. Clients and service providers will be committed to provide all the procedures to ensure safety of the workers during installation and maintenance processes 
  9. Abiding by the standards and technical specifications for the installation of the PV system, according to Egypt PV guidelines, to ensure the quality assurance of the  system.
  10. Commitment from the owner to allow periodic visits by the project’s team for evaluation and audit checks to the technical aspects during  and after implementation, with the supplier’s commitment to accept all the technical reviews, and abide all the instructions of the institutions that are responsible   for inspection and reviewing.
  11. Clients who will provide an insurance policy for the system will have a priority in the selection process.
  12. The facility shall have a maintenance contract to ensure periodic maintenance work, and ensure commitment to provide trained and qualified technical workers, and provide the required tools to be able to meet maintenance requests as soon as possible.
  13. Installation of the PV system shall be visible from the street, to increase the public awareness.
  14. Technical assistance will be necessary to include conceptual design, tendering documents, technical specifications and support in the bidding process.
  15. Procurement will be through government bidding process and a protocol will be signed between the government entity and the project.